Replace Main Water Loop

Year Complete
2025
Project Size
Campus-wide
Project Location
Charles George VA Medical Center, Asheville, NC
Services Included
  • Civil Engineering
  • Project Management
  • Construction Services
  • Site Survey

Services Provided: Project Management, Civil Engineering

The Atriax team developed a design for the replacement of the campus main water loop network. Approximately 6,900 LF of pipe were removed or replaced, including 8-inch, 6-inch and 4-inch diameter pipes. Dozens of new elbows, tees and gate valves were required to tie the new and existing network together. Approximately 1,500 square yards of asphalt parking lots and roadways were removed/replaced to install the new pipes. Construction phasing was used to create contiguous sections of work that served as bid deducts, limited road and parking lot closures, and in general minimized campus disruptions.

Key Words: water loop network, civil engineering, drainage, roadway

Picture1 Asheville main water loop Picture2 Asheville main water loop Picture3 Asheville main water loop
More Projects